References
- BMW
- Jaguar
- Land Rover
- SAICA Paper
- NESTLE
- Aston Martin
- Case New Holland
- Ventcroft, Boots
- Lafarge
- Tarmac
- Schneider Electric
- British Gypsum
- Morgan Sindall
- Allied Bakeries
- Barry Callebaut
- Honda
- Cadbury
- Nissan
- Unipart
- Cemex
- Mercedes-Benz
- Man Diesel
Some of our projects
Project description
Migration of the historic factory management systems to a more considered, structured and future-proof solution satisfying industry and quality audit demands.
Solutions
- At the core of the project is a Twinning Agreement between Actemium Final Assembly Systems Limited and Actemium Business Consultancy, Veghel, Netherlands.
- GE Proficy Suite: Cimplicity (Scada) ; Historian ; Plant Applications ; SDK
- Microsoft AX Dynamics Interface
- SQL Server Reporting
- ISA-95 philosophy
Project description
The project is to install containment from a new control panel to 19 chocolate holding tanks supplying pumps, stirrers ,I/O remote panels and various items of control / instrumentation, the project will see us then install both power, control and instrumentation cables. The project will encompass stainless steel containment when in direct contact with the product and galvanized ladder in all other areas.
The contract will also include our attendance in I/O testing and during the commissioning process
Solutions
Basic installation techniques carried out in a food hygiene environment utilizing our installation skills within the secondary food sector
Project description
CAB & Command arm testing.
Solutions
- Project Management
- Electrical & Mechanical Design
- Based on standard Actemium Stratus 6 software platform
- Assembly & Test
- Can be expanded quickly at later date for new vehicles
- Phase 2 – June 2012
- Phase 3 – December 2012
Project description
Nissan Motors UK required multiple charge points for each of their dealerships throughout the UK to support their electric vehicle, the ‘Leaf’. As Nissan’s preferred installation partner we designed and installed the electrical and civil works associated with this project.
Each dealership required a rapid charger, dual outlet charging post and a workshop charging point.
Solutions
- Design and install of electrical and civil works to support a 50kW 3-phase rapid charger, a dual 13A accessible charging post and a 32A workshop charger at each dealership
- Quick response and resolution to site suitability issues caused by incorrect assumptions made by others
- Engaging electrical supply companies for cable / metering upgrades plus other ancillary works
- Quick mobilization of additional resources and management of external companies resolving un-expected additional engineering and major re-scheduling
Project description
- Site Management
- Breakdown and Maintenance
- Fixed site presence
- Mobile workshop facility
- 6 operative full time plus support
Technical highlights
- Plant process understanding
- Equipment knowledge
- Engineering support
- Electrical and Instrument knowledge
- IT interface with process
Project description
- Assembly of Agriculture vehicles (tractors) in accordance with Tier 4 Emissions Regulations.
- Stratus6 based End of Line Diagnostic Test System (Hardware & Software).
- Utilises core software produced for CNH, UK, facility.
- Replaces existing test system to provide an integrated solution for all tractors assembled in Jesi, Italy.
- A wireless test solution for maximum production efficiency.
Power Management System Generator Control Panels Motor Control Centres for 3 SGT-300 Gas Turbines.
Design & Manufacture of three Generator Control Panels, associated Motor Control Centres and one PMS Panel to Control and Synchronise three 10MW Gas Turbines.
Supply and installation of Electrical Engineering, Control and Instrumentation for New Gas Storage site under Compex /Atex conditions.
Design, manufacture and commissioning of the Gas Turbine Control System including the Power Management System for load shedding, monitoring, power distribution and synchronisation with electricity network for Tengiz – Chevron
Design, build & installation of L.V. switchboards, motor control centres, instrument control panels, mimic display panels and cave control consoles. Designed in accordance with BNFL specification & standards with Bus bar systems rated 50KA / 1 second and 50 KA / 3 seconds ASTA certified.
Design, build and installation of extensions to existing low voltage power distribution switchboard systems. Installation carried out by our team in accordance with a pre planned shutdown program.
B Plant Upgrade:
- Containment ,i.e. ladder and stainless conduit / trunking
- Plant cable supplies
- Data and control cabling
- Mechanical services – pipework installation
Plant technical:
- Electrical Installations Lighting and power
- Data Network Cabling
- Process Control Cabling
- Design, Manufacture & Installation of Control Panels
Provision of Labour and materials to carry out HV/LV installations of distribution and process electrical system under the supervision and instruction of Actemium Strasbourg.
Design and Installation of Power, Instrumentation & Control Cabling:
- Stringent Programme and Health & Safety Requirements
- Instrument installation incl. hydraulic pipe work
- LV and HV Electrical Works
- Control & Instrumentation Cabling
- Testing & Commissioning
Design installation and commissioning of field instrumentation & control cabling system and control cabinets in a paper production plant.